To Replace Hold Switch; To Replace Ice Maker Control Shut-Off Switch; To Replace Ice Maker Thermostat; To Replace Tco - Electrolux BEVERAGE CENTER II Service Manual

Table of Contents

Advertisement

To Replace Hold Switch

1. Remove front Cover.
2. Remove three screws that attach Mounting Plate to
Support Housing.
3. Disconnect six Hold Switch wire leads.
4. Remove two Hold Switch mounting screws.
5. Remove Hold Switch.
6. Replace in reverse order.
To Replace Ice Maker Control Arm Shut-OFF Switch
1. Remove front Cover.
2. Remove three screws that attach Mounting Plate to
Support Housing.
3. Disconnect three Ice Maker Control Arm Shut-Off
Switch wire leads.
4. Raise Ice Maker Control Arm Lever.
5. Remove two Ice Maker Control Arm Shut-Off Switch
mounting screws.
6. Remove switch.
7. Replace switch in reverse order.

To Replace Ice Maker Thermostat

1. Remove front Cover.
2. Remove three screws that attach Mounting Plate to
Support Housing.
3. Loosen two Thermostat retaining clip mounting
screws.
4. Disconnect two thermostat wire leads and remove
thermostat.
5. Apply thermal mastic sealer to sensing surface of
replacement thermostat to ensure a positive bond
to mold.
6. Replace thermostat in reverse order.
To Replace Thermal Cut-Out (TCO)
1. Remove front Cover.
2. Remove three screws that attach Mounting Plate
to Support Housing.
3. Pull cable assembly free from support housing. It will
slide out easily.
4. Loosen screw securing clamp to TCO. TCO should
come free after tension from clamp is released.
5. Disconnect TCO from two wire nuts. One end is
connect to the cable assembly and the other end is
connected to the motor and mold heater.
6. Replace with new TCO.
7 Reassemble in reverse order.
57
Figure F6

Advertisement

Table of Contents
loading

Table of Contents