Leveling The Compactor; Adjusting The Retaining Bracket; Adjusting The Base Toekick - GE GCG1580 SS Installation Instructions Manual

15" built-in compactors
Table of Contents

Advertisement

Available languages

Available languages

Installation Preparation
i-_ LEVELING THE COMPACTOR
• The top of the compactor
should be at least 1/8"
(3 mm) from the top of the cabinet opening. You
can adjust the height of the compactor
bg turning
the screws on the front leveling legs and rear
wheels.
Frontlevelinglegs
Rearwheels
• Place a level inside the compactor
on the floor
of the cabinet.
\
• Use the leveling legs to adjust level front to back
and side to side.
@ ADJUST THE RETAINING BRACKET
• Determine
installation
depth of the compactor
beneath the countertop.
• Adjust the position of the retaining
brackets so
that the screws can meet the underside
of the
countertop.
Mounting clips are provided for stone or other
hard countertops
that will not accept screws.
Retaining
bracket
C0untert0p
r_ ADJUSTING THE BASE TOEKICK
A toekick extension
is supplied. It can be used to
cover any gaps from the bottom
of the compactor
to the floor. ZCGS150SS and ZCGP15011 Models are
also supplied with extra toekicks which can replace
the original toekicks assembled
on the compactor.
• Remove the top toekick screws as shown. Lift off
top toekick piece.
Loosen the base toekick screws, adjust to touch
the floor and tighten the screws. If replacing the
toekick, remove the screws and lift off the toekick.
Install the new toekick with the original screws.
• Reinstall the top toekick piece with the original
screws.
/
Topt0ekick
Loosenscrew
Baset0ekick
on eachside

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gcg1700 iiGcg1500 ww

Table of Contents