■ Outdoor unit installation
When the upper space is open (Unit : mm)
(1) Obstacles at rear only
100 or more
(3) Obstacles at front
600 or more
When an obstruction in the upper space (Unit : mm)
(1) Obstacles at rear and above
Max. 200
600 or more
100 or more
■ Multiple outdoor unit installation
• Provide at least 250 mm of space between the outdoor units if multiple units are
installed.
• When routing the piping from the side of an outdoor unit, provide space for the piping.
When the upper space is open (Unit : mm)
(1) Obstacles at rear only
200 or more
(3) Obstacles at front and rear
(2) Obstacles at rear and sides
100 or more
100 or more
250 or more
(4) Obstacles at front and rear
100 or more
600 or more
(2) O bstacles at rear, sides, and above
Max. 200
600 or
more
100 or more
100 or more
250 or more
(2) Obstacles at front only
1,000 or more
200 or more
1,000 or more
When an obstruction in the upper space (Unit : mm)
(1) Obstacles at rear and above
• Up to 3 units can be installed side by side.
• When 4 units or more are arranged in a line, provide the space as shown below.
Max. 300
1,500 or more
■ Outdoor units installation multi-row
(1) Single parallel unit arrangement
500 or more
(2) Multiple parallel unit arrangement
NOTES:
• If the space is larger than stated above, the condition will be the same as when there
is no obstacle.
• When installing the outdoor unit, be sure to open the front and left side to obtain
better operation efficiency.

3.2. Mounting the unit

• Install 4 anchor bolts at the locations indicated with arrows in the figure.
• To reduce vibration, do not install the unit directly on the ground. Install it on a secure
base (such as concrete blocks).
• The foundation shall support the legs of the unit and have a width of 50 mm or more.
• Depending on the installation conditions, the outdoor unit may spread its vibration
during operation, which may cause noise and vibration. Therefore, attach damping
materials (such as damping pads) to the outdoor unit during installation.
• Install the foundation, making sure that there is enough space for installing the
connection pipes.
• Secure the unit to a solid block using foundation bolts. (Use 4 sets of commercially
available M10 bolts, nuts, and washers.)
• The bolts should protrude 20 mm. (Refer to the figure.)
• If overturning prevention is required, purchase the necessary commercially available
items.
1,500 or more
200 or more
(Unit : mm)
100 or more
1,000 or more
200 or more
200 or more
2,000 or more
400 or more
1,000 or more
200 or more
En-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aoyg 18 kbta2

Table of Contents