Step 4�
Remove the two (2) tensioning bolts to remove the pulley from the blow shaft. Use the
11 mm wrench to loosen the two bolts in front of the pulley tensioning bushing.
Step 5�
After both tensioning bolts are removed, thread
the same bolts in the adjacent holes using the
11 mm wrench. Threading the two bolts will
cause the pulley to separate from the tensioning
bushing.
Step 6�
When reinstalling the pulley on to the blower
shaft, ensure the engraved model number is fac-
ing away from the blower. Insert the pulley ten-
sioning bushing over the blower shaft and into
the pulley. Insert the tensioning bolts through the
two non-threaded holes on the tensioning bush-
ing to the threaded holes on the pulley.
Before securing the tensioning bushing, ensure
that the V groove in the pulley and the sheave
are inline. After the pulley location has been
adjusted, secure the pulley by tightening the
tensioning bolts using the 11 mm wrench.
PULLEY REMOVAL / ADJUSTMENT
Figure 47: Threading Bolts in Adjacent Holes.
Figure 49: Engraved Model Number Facing
Away From the Blower.
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 46: Loosening the Bolts in Front of the Pulley
Tensioning Bushing.
Figure 48: Separating the Pulley from the
Tensioning Bushing.
Figure 50: Ensuring the V Groove and
Sheave are Inline.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arnu483dda4Arnu603dda4Arnu723dda4

Table of Contents