Patient (Source) Leakage Current Test

Test Equipment
Revision B
Maintenance: Electrical Safety Tests
8. Set the polarity switch to RVS and observe the same meter readings
as in the previous step.
9. Set the leakage tester power switch to OFF and remove the meter
lead connected in step 2.
127(
Connect a Dash monitor to the docking station to complete this test.
Equipment required to perform these tests is listed below. Equivalent
equipment may be substituted as necessary.
Name
ECG Test Body
Temp/CO Test Body
This procedure only applies to Class I (grounded/earthed) equipment,
and measures the leakage current from the ECG and TEMP/CO
connectors of the device to ground.
1. Set leakage tester switches as follows:
Selector knob – 3,
GND switch – GND OPEN,
Polarity switch – NORM,
Power switch – OFF.
2. Connect an ECG test body to the ECG connector of the DUT.
3. Connect a short length of cable between the ECG test body installed
in the last step and the jacks on the top of the leakage tester.
4. Set the leakage tester power switch to ON.
5. Set the rear panel power switch of the device to ON.
Dash Port Docking Station
2000966-037
Manufacturer
GE Medical Systems Information
Technologies
GE Medical Systems Information
Technologies
Part Number
MT-3387
MT-3644
3-13