Flow Chart For Operation; Switch-On; Preparation; Driving The Vehicle Into Position - Bosch VLS 5235 Original Instructions Manual

Table of Contents

Advertisement

6.2

Flow chart for operation

Fig. 4:
Flow chart of raising
Fig. 5:
Flow chart of lowering
Robert Bosch GmbH
Operation | VLS 5235 | 13
6.3

Switch-on

Switch on the VLS 5235 by way of the master switch.
Set the master switch to the ON (I) position.
"
Lifting platform is ready for operation.
6.4

Preparation

1. Make sure that the runway is completely lowered.
2. Make sure that the auxiliary lift is completely
lowered.
3. Remove any tools, dirt, grease, and oil from the
vicinity of the lifting platform.
"
The vehicle can now be driven onto the lifting platform.
6.5

Driving the vehicle into position

DANGER – Incorrect positioning of vehicle!
Risk of (fatal) injury due to the vehicle falling
or tipping during lifting or lowering and when
working on the vehicle.
Drive the vehicle into position exactly as
described.
1. Drive the vehicle in a straight line to the center
of the lifting platform. The wheels on each side
of the vehicle must be on the center line of the
corresponding runway.
2. Stop the vehicle and secure in position by applying
the parking brake or engaging a gear.
3. Exit the vehicle.
4. Check the position of the vehicle.
"
The vehicle is now positioned on the lifting platform.
VLS 5235 | 13
| 13
en
|
1 697 090 700
2014-04-10

Advertisement

Chapters

Table of Contents
loading

Table of Contents