Sign In
Upload
Manuals
Brands
SolarEdge Manuals
UPS
B60US-IB
SolarEdge B60US-IB Manuals
Manuals and User Guides for SolarEdge B60US-IB. We have
1
SolarEdge B60US-IB manual available for free PDF download: Installation Manual
SolarEdge B60US-IB Installation Manual (148 pages)
Three-Phase Modular UPS
Brand:
SolarEdge
| Category:
UPS
| Size: 6.03 MB
Table of Contents
Table of Contents
4
Preface
9
1.1. Standards and Conventions
9
1.2. Safety Symbols Information
9
1.3. Technical Support
10
Unpacking Instructions
11
Figure 1: B60US-IB UPS (Perspective View)
11
Figure 2: Inspect the Shipping Crate for Signs of Damage
12
Figure 3: Shockwatch and Tiltwatch Devices
13
Figure 4: Front and Back of System Crate
14
Figure 5: Remove the Crate Roof and Support Beam (Use Electric Screwdriver)
14
Figure 6: Ramp Wall
15
Figure 7: Ramp Pins
15
Figure 8: System Placement
15
Safety Precautions
17
3.1. Do's
17
3.2. Don'ts
19
System Structure and Installation
20
Figure 9: Major Components of Ups System
21
Figure 10: Front Service Panel
23
Figure 11: Main Terminals Viewed from the Ups Rear
24
4.1. Important Installation Information
25
4.2. Checklists
26
Pre-Install Checklist
26
Installation Checklist
31
4.3. UPS Installation Procedure
53
Visual Inspection
53
Physical Site Preparation
54
Figure 12: Dimensions of Solar Edge B60Us-Ib Ups (1)
55
Figure 13: Dimensions of Solar Edge B60Us-Ib Ups (2)
56
Figure 14: Recommended Minimum Clearance for Air Ventilation Around UPS for Temperature below 86
58
Table 5: Recommended Minimum Clearance for Air Ventilation Around Ups
59
Mechanical Test
60
Electrical Site Preparation
61
Cabling
62
The Ground Line
63
The Neutral Line
63
AC Input and Output Connections
63
Figure 15: Recommended System Connections
65
Figure 16: Recommended Connections with Input Isolation Transformer
66
Figure 17: Terminal Connections
67
Connecting the UPS to the Electrical Panel
68
Table 6: Recommended Circuit Breakers for the Current Rating for 20-60Kva 208V UPS
69
Assembling and Connecting Internal Batteries
70
Figure 18: Internal Battery Bank Layout
71
Figure 19: Single Battery Tray
71
Figure 20: Connect the Eighth Battery on each Tray
71
Figure 21: Link the Four Batteries on each Side of the Tray
72
Figure 22: for Safe Disconnection of the Batteries
72
Figure 23: Cable Plugs on One End, Anderson-Type Plugs on the Other
73
Figure 24: One of the Internal Battery Banks
73
Assembling and Connecting External Batteries
74
Figure 25: Connecting a Single Battery Set
75
Table 7: Battery Current Ratings for Semiconductor Fuses and Circuit Breakers
76
Figure 26: Connecting Multiple Battery Sets, Using Cbs
77
Attaching Optional Cable Stress Reliever
78
Figure 27: Rear Bottom Screen of the Ups
78
Figure 28: Attaching the Optional Cable Stress Reliever
79
Figure 29: Wire Stress Reliever Connection
79
Attaching Optional Seismic Brackets
80
Figure 30: Seismic Bracket Assembly
80
Figure 31: Bracket Connection Points
81
System Power up and Initialization
82
Before UPS Startup
82
Initial UPS Configuration
83
Figure 32: Initial Configuration Wizard
83
Figure 33: Initial Configuration Wizard: Password Entry
84
Figure 34: Initial Configuration Wizard: Battery Capacity in Ah
85
Figure 35: Initial Configuration Wizard: Set Time Zone
86
Figure 36: Finish Configuration Wizard
86
Figure 37: System Profile
87
Figure 38: Adjust Date/Time Screen
87
Module System Integration
88
Figure 39: Flat Cables
88
Figure 40: Rectifier Led
88
Figure 41: Modules on
89
Figure 42: Inverter Led
89
Figure 43: Confirm Disconnecting the Load
89
Figure 44: Confirm Switch on All Modules
90
Figure 45: the Alarms Icon Indicates Alarm Conditions
91
Figure 46: Next Scheduled Test Screen
92
Figure 47: Battery Test in Progress Screen
93
Figure 48: Confirm Transferl
93
Figure 49: Confirm Transferl
94
Assigning IP Address to UPS
95
Figure 50: Ip Address Configuration
95
Figure 51: Ip Address Configuration
96
Figure 52: Set Last Maintenance
97
Figure 53: Confirm Save Users
98
4.4. Testing
99
Test: Self-Loading Mode
100
Figure 54: Enable Self-Loading Mode
100
Figure 55: Self-Loading Mode Setup
101
Figure 56: Self-Loading Mode
101
Figure 57: Reactive Load Testing
102
Figure 58: Disabling Self -L
103
Test: under Load
104
Test: Battery and Blackout Mode
105
Test: ATS
106
Figure 59: Generator Mode
106
Figure 60: Changing the Auxiliary Contact to Normally Closed
107
Test: ECO Mode
108
Figure 61: Eco Mode Screen - E
108
Figure 62: Turning on Eco Mode
109
Figure 63: Status Screen , Ups on
109
Test: IP Communication with Controller
111
Figure 64: Web View
112
Auxiliary Connections
113
Figure 66: Close - up of Connector
114
Figure 67: Connector Group 2
115
Table 9: Description of Connector Group 2 (Key to Figure 67)
115
5.1. Input and Output Dry Contacts
119
5.2. Emergency Power off (EPO) Manual
120
Figure 68: Epo Wiring Diagram
120
Restarting UPS after EPO
121
5.3. Surge Protector Malfunction Alarm
121
5.4. LVD Battery Protector
122
Figure 69: Lvd Wiring Diagram
122
Figure 70: Battery Breaker Warning
123
Figure 71: Active Alarms
123
Circuit Breaker Selectivity
124
Figure 72: a Ups's Bypass Circuit
124
Parallel Operation
126
7.1. Theory
126
Decentralized Static Switch Method
127
Figure 73: the Static Switch in Context
127
Parallel Communication
128
Figure 74: Parallel Comm
128
Figure 75: Location of the Parallel Comm
129
EPO and Parallel Operation
130
Common Vs. Decentralized Battery
130
7.2. Instructions for Parallel Configuration
131
Table 10: Cable Sets for Parallel Communication between Upss
131
Figure 76: Common DC P
132
Figure 77: Decentralized DC P
132
Figure 78: System Menu Screen
133
Figure 79: the Crown Icon Indicates the Figure 80: Pfc Input
133
Figure 81: Ac Output Voltage Display for a Single Module
135
Figure 82: Connection Diagram for Figure 83: Connection Diagram for
137
Maintenance Bypass for Parallel Systems
139
Table 11: Rating of CB12 (for Maintenance Bypass Option)
139
Procedure: Maintenance Bypass Mode
140
8.1. Circuit Breaker Layout
141
Figure 84: Electrical Setup
141
Transferring the Ups to Maintenance Bypass Mode from Normal Mode
142
Figure 85: UPS on - Normal Mode
142
Table 12: Normal Mode Operating Position of the Circuit Breakers
142
Figure 86: Transfer Load to Bypass Confirm Dialog
143
Figure 87: Ups on - Bypass Mode
143
Table 13: Position of the Cbs in Maintenance Bypass Mode
144
Transferring the Ups Back to Normal Mode from Maintenance Bypass Mode
145
Table 14: Maintenance Bypass Operating Position of the Circuit Breakers
145
Table 15: Position of the Cbs in Normal Mode
145
Using Ups with Generator
146
The Automatic Transfer Switch (Ats)
146
Figure 88: Timing Variables When Using a Generator and an Figure 89: Example of an Ats
146
Service and Repairs
147
Document Changes
148
Table 16: Document Updates
148
Advertisement
Advertisement
Related Products
SolarEdge Gamatronic B300
SolarEdge Gamatronic B120US
SolarEdge Gamatronic B240US
SolarEdge StorEdge BI-NUSGN-01
SolarEdge Critical Power B300
SolarEdge L20-IB60, L20-IB00
SolarEdge L30-IB60, L30-IB00
SolarEdge Categories
Inverter
Measuring Instruments
Recording Equipment
UPS
Control Unit
More SolarEdge Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL