GE XL44 Series Owner's Manual & Installation Instructions page 41

Standard-clean and continuous-clean models
Table of Contents

Advertisement

For cement or concrete construction, you
" lag bolt and a 1/2" O.D.
will need a 1/4" x 1
1
2
sleeve anchor, which are not provided. Drill
the recommended size hole for the hardware.
Install the sleeve anchor into the drilled hole
and then install the lag bolt through the device.
The bolts must be properly tightened as
recommended for the hardware.
Wallboard
Anti-Tip
device
Wood screw
Wallplate
5. Slide the range against the wall, and check
for proper installation by grasping the front
edge of the cooktop and carefully attempting to
tilt the range forward.
WHEN ALL HOOKUPS ARE COMPLETED:
MAKE SURE ALL CONTROLS ARE LEFT IN
THE OFF POSITION.
MAKE SURE THE FLOW OF COMBUSTION
AND VENTILATION AIR TO THE RANGE IS
UNOBSTRUCTED.
CONVERTING TO LP GAS
(or converting back to natural gas from LP)
This range leaves the factory set for use with
natural gas. If you want to convert to LP gas, the
conversion must be performed by a qualified LP
gas installer.
The conversion instructions and LP orifices
can be found attached to the range next to the
Back of
range
pressure regulator.
Keep these instructions and the orifices in case
you want to convert back to natural gas.
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents