Download Print this page
HP DL580 - ProLiant - G4 Installation Instructions Manual
HP DL580 - ProLiant - G4 Installation Instructions Manual

HP DL580 - ProLiant - G4 Installation Instructions Manual

Quick deploy rail system
Hide thumbs Also See for DL580 - ProLiant - G4:

Advertisement

HP 3-7U Quick Deploy
Rail System

Installation Instructions

for HP products
© Copyright 2005-2006 Hewlett-Packard Development Company, L.P.
The information contained herein is subject to change without notice. The only
warranties for HP products and services are set forth in the express warranty
statements accompanying such products and services. Nothing herein should
be construed as constituting an additional warranty. HP shall not be liable for
technical or editorial errors or omissions contained herein.
June 2006 (Third Edition)
Part Number 378950-003
Overview
This rack hardware kit supports a variety of 3-7U HP products
in round-, square-, or threaded-hole racks. Use the legend to
identify installation steps appropriate to the type of rack.
IMPORTANT: If you are shipping the server installed
in a rack, see the additional instructions located in
"Preparing the product for rack relocation or
integrated shipping" before proceeding.
Hardware kit contents
In addition to the supplied items, you may need:
Screws that fit a threaded-hole rack
The appropriate screwdriver for the screws
Kit 371482-B21 for integrated shipping a
round-hole rack

Rack warnings

WARNING: To reduce the risk of personal
injury or damage to the equipment,
be sure that:
The leveling jacks are extended to
the floor.

Advertisement

loading

Summary of Contents for HP DL580 - ProLiant - G4

  • Page 1: Installation Instructions

    In addition to the supplied items, you may need: Screws that fit a threaded-hole rack The appropriate screwdriver for the screws © Copyright 2005-2006 Hewlett-Packard Development Company, L.P. Kit 371482-B21 for integrated shipping a The information contained herein is subject to change without notice. The only...
  • Page 2 Installing the product in a rack The full weight of the rack rests on the leveling jacks. The stabilizing feet are attached to the CAUTION: Always plan the rack installation so that rack if it is a single-rack installation. the heaviest item is on the bottom of the rack. Install The racks are coupled together in the heaviest item first, and continue to populate the multiple-rack installations.
  • Page 3 IMPORTANT: If you are installing the server in a shallow rack [i.e., less than 72.39 cm (28.5 in)], see the additional instructions located in "Preparing the rails for shallow rack installation" before proceeding.
  • Page 4 WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately stabilized before sliding the server into the rails. WARNING: To reduce the risk of personal injury or equipment damage, do one of the following: Use two or more people to lift and stabilize the product pieces...
  • Page 5: Installing The Cable Management Arm

    Installing the cable CAUTION: Be sure to keep the product parallel to the floor when sliding the server into the rails. management arm Tilting the product up or down could result in damage to the slides. IMPORTANT: If you need to hinge the cable management arm on the rear right-hand side of the rack, see the instructions located in "Converting the cable management arm swing"...
  • Page 6 Converting the cable management arm swing The cable management arm is designed for ambidextrous implementation. You can convert the arm for right-hand swing. NOTE: To access some components on the rear of the product, you may need to remove the cable management arm.
  • Page 7 IMPORTANT: When converting the cable arm, always be sure to orient the arm with the cable trough facing upward. The cable management arm is ready for installation on the rack. Preparing the rails for integrated shipping in a rack IMPORTANT: You must provide screws to secure the slide mounting bracket assemblies in a threaded-hole rack.
  • Page 8 IMPORTANT: You will need kit 371482-B21 to NOTE: Use the integrated shipping hardware prepare a round-hole rack for integrated shipping. included with this kit to prepare a square-hole rack for integrated shipping.
  • Page 9 Preparing the product for rack relocation or integrated shipping Return to step 1 in "Installing the product in a rack." To service or remove the product from the rack, reverse the procedures in this section: Remove the rear slide locking screw and the front rail locking screws.
  • Page 10: Rack Installation

    Preparing the rails for shallow rack installation Return to step 2 in "Installing the product in a rack."...

This manual is also suitable for:

Dl785 - proliant - g53-7u