Verifying The Connection - SolarEdge SE8000H-AU Installation Manual

Single phase inverter with hd-wave technology
Table of Contents

Advertisement

To connect to the monitoring platform:
 1.  Designate a single inverter as the connection point between the RS485 bus and the SolarEdge 
monitoring platform. This inverter will serve as the master inverter.
 2.  Connect the master to the SolarEdge monitoring platform via the LAN or ZigBee communication 
option.
To configure the RS485 communication bus:
All inverters are configured by default as slaves. If   r econfiguration is required:
 1.  Make sure the ON/OFF switch is OFF.
 2.  Turn ON the AC to the inverter by turning ON the circuit breaker on the main distribution panel. 
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is removed.
 3.  Use the internal buttons to configure the connection (slightly touch the black square buttons). To set 
the inverter designated as master, select the following in the LCD menus:
 
Communication è Server è LAN,   Z igBee or Wi-Fi
l
 
RS485-1 Conf. è Device Type è SolarEdge
l
 
RS485-1 Conf. è Protocol è Master
l
 
RS485-1 Conf. è Slave Detect
l
The system starts automatic detection of the   s lave inverters connected to the master inverter. The 
inverter should report the correct number of slaves. If it does not, verify the connections and 
terminations.
 4.  Verify the connection of the master to the   m onitoring platform, as described in the next section.

Verifying the Connection

After connecting and configuring a communication option, perform the following steps to check that 
the connection to the monitoring server has been successfully established.
 1.  Close the inverter cover: Attach the inverter cover and secure it by tightening the screws with a 
torque of 3.0 N*m/ 2.2 lb.*ft. For proper sealing, first tighten the corner screws and then the two 
central screws. 
 2.  If not already ON - Turn ON the AC to the inverter by turning ON the circuit breaker on the main 
distribution panel and turning on the   ( if applicable).
 3.  Wait for the inverter to connect to the SolarEdge monitoring platform. This may take up to two 
minutes.
A status screen similar to the following appears on the LCD panel:
V a c [ V ]
2 4 0 . 7
P _ O K :
0 0 0 / 0 0 0
- - - - - - - - - - - - - - -
S_OK: Indicates that the connection to the SolarEdge monitoring platform is successful. If S_OK is not 
displayed, refer to Troubleshooting Communication on page 54.
Single Phase Inverter with HD-Wave Technology Installation MAN-01-250-1.2
V d c [ V ]
P a c [ w ]
1 4 . 1
0 . 0
< S _ O K >
O F F
Chapter 6: Setting Up Communication
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se3000h-auSe2500h-au

Table of Contents