Energy Meter Status; Telemetry Status - SolarEdge SE8000H-AU Installation Manual

Single phase inverter with hd-wave technology
Table of Contents

Advertisement

Energy Meter Status

Displays the total energy produced during the last day, month, year and since inverter installation.
D a y [ W h ] :
M o n t h [ K W h ] :
Y e a r [ K W h ] :
T o t a l [ K W h ] :
Day: since midnight
l
Month: since 1st of the current month until today (inclusive)
l
Year: since January 1st until today (inclusive)
l
If   a  meter is connected to the inverter, the following status screen, showing the power and energy 
readings, is displayed in addition to   t he above screen.
If the meter is set to Export +Import, there are two status screens, with the first line displaying: "Export 
Meter" or "Import Meter". The following is an example of an export meter status:
E x p o r t
S t a t u s :
P o w e r [ W ] :
E n e r g y [ W h ] :
Status: Displays OK if the meter is communicating with the communication board.
l
<Error message>: If there is a meter error, it is displayed in this line. 
l
Power (W): Depending on the meter type connected to the inverter, this line displays the exported 
l
or imported power in Watts.
Energy (Wh): The total energy read by the meter, in Watt/hour. The value displayed in this line 
l
depends on the meter type connected to the inverter and its location:
 
If a bidirectional meter is connected at the consumption point, this value is the consumed energy.
o
 
If the meter is installed at the production connection point, this value is the energy produced by
o
the site.
 
If the meter is installed at the grid connection point, this value is the energy exported to the grid.
o
If the inverter is connected to the SolarEdge server, this value will also be displayed in the monitoring 
platform.
NOTE
This data is accumulated according to an internal real-time clock.

Telemetry Status

This screen displays the last power optimizer telemetry received. The display changes as each power 
optimizer sends its telemetry.
In order to verify proper installation, the installer may view the Telemetry window for some time in order 
to observe the power optimizers' report process.
M o d u l e :
E n e r g y [ W h ] : 5 6 . 7
V d c _ O [ V ] :
V d c _ I [ V ] :
I _ i n [ A ] :
T e m p [ C ] :
Module: Power optimizer serial number
l
Energy: power optimizer energy
l
Single Phase Inverter with HD-Wave Technology Installation MAN-01-250-1.2
0 . 0
0 . 0
0 . 0
0 . 0
M e t e r
< O K / E r r o r # >
x x x x x . x
X X X X X . X
1 0 2 8 8 0 6 3
1 B
4 0 . 0
3 8 . 3
7 . 8
2 8 . 0
Chapter 5: Configuring the Inverter
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se3000h-auSe2500h-au

Table of Contents