Creating A Site In The Monitoring Platform; Paper Template - SolarEdge SE8000H-AU Installation Manual

Single phase inverter with hd-wave technology
Table of Contents

Advertisement

Creating a Site in the Monitoring Platform

iPhone
Use the Mapper smartphone application to scan the power optimizer and inverter 2D bar-codes. This 
application creates an XML file that can be uploaded to the   m onitoring platform during site registration. 
The Mapper can be downloaded from the application stores.
For detailed information, refer to the Mapper Software Guide or to the Site Mapper demo 
movie, available on the SolarEdge website at 
http://www.solaredge.com/groups/installer-tools/site-mapper.
 
 
Creating a Site in the Monitoring Platform
Create the site in the monitoring platform using the registration form available at  
https://monitoring.solaredge.com/solaredge-web/p/login. Fill out all required 
information in the form, which includes information about your installation, as well as 
details about its logical and physical mapping.
 

Paper Template

Fill out the Physical Layout Template (downloadable from the SolarEdge site) using the 
detachable 2D barcode stickers on each power optimizer. Once the form is completed, 
scan it and upload the scanned file to the   m onitoring platform during site registration. 
For an example paper template, refer to http://www.solaredge.com/files/pdfs/physical-
layout-template.pdf.
 
30
Single Phase Inverter with HD-Wave Technology Installation MAN-01-250-1.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se3000h-auSe2500h-au

Table of Contents