Step 4: Verifying Proper Power Optimizer Connection
In SolarEdge systems, due to the introduction of poweroptimizers between the PV modules and the 
inverter, the short circuit current I
those in traditional systems. 
For more information about the SolarEdge   s ystem's string voltage and current, refer to 
the V
 and I
 in SolarEdge Systems Technical Note, available on the SolarEdge website at: 
OC
SC
http://www.solaredge.com/files/pdfs/isc_and_voc_in_solaredge_systems_technical_
note.pdf . 
To verify proper power optimizer connection:
Measure the voltage of each string individually before connecting it to the other strings or to the inverter. 
Verify correct polarity by measuring the string polarity with a voltmeter. Use a voltmeter with at least 
0.1V measurement accuracy.
NOTE
Since the inverter is not yet operating, you may measure the string voltage and verify correct polarity
on the DC wires inside the Connection Unit.
For troubleshooting power optimizer operation problems, refer to Power Optimizer Troubleshooting  on 
page 60.
18
Single Phase Inverter with HD-Wave Technology Installation MAN-01-250-1.2
 and the open circuit voltage V
SC
 hold different meanings from 
OC

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se3000h-auSe2500h-au

Table of Contents