Connecting A Pv Module To A Power Optimizer - SolarEdge SE330K Installation Manual

Hide thumbs Also See for SE330K:
Table of Contents

Advertisement

Connecting a PV module to a Power Optimizer

NOTE
Improper wiring may cause electrical faults in a PV system. To avoid electrical
faults, verify proper locking of connectors and avoid cable tension and friction.
Proper planning, materials and installation reduce the risk of electric arcs,
short-circuits and ground faults in the PV system.
NOTE
Images are for illustration purposes only. Refer to the label on the product to
identify the plus and minus input and output connectors.
NOTE
When connecting SolarEdge Power Optimizer to multiple PV modules, the
modules must be of the same type.
NOTE
When connecting two modules to one Power Optimizer, both PV modules
must be positioned at the same orientation and tilt angle.
For each Power Optimizer:
Connect the Plus (+) output connector of the module to the Plus (+) input connector
of the Power Optimizer.
Connect the Minus (-) output connector of the module to the Minus (-) input
connector of the Power Optimizer.
CAUTION!
Do not sharply bend the DC cables. Keep proper bending radius to avoid
cable breakage.
ATTENTION!
 
Ne pliez pas brusquement les câbles DC. Gardez un rayon de courbure
approprié pour éviter la rupture du câble.
SE330K Inverter P/N: SE330K-xxxxxxxxx
Chapter 3: Installing the Power
Optimizers   34

Advertisement

Table of Contents
loading

Table of Contents