Step 3: Verifying Proper Operation; Step 4: Reporting And Monitoring Installation Data; The Solaredge Monitoring System - SolarEdge StorEdge SE7600A-USS Installation Manual

Hide thumbs Also See for StorEdge SE7600A-USS:
Table of Contents

Advertisement

Step 3: Verifying Proper Operation

Step 3: Verifying Proper Operation
After the wake-up time is over, a status screen similar to the following appears on the inverter LCD panel:
V a c [ V ]
2 4 0 . 7
3 7 1 . 9
P _ O K :
X X X / Y Y Y
. . . . . . . . . . . . . . . . .
 1.  Verify the following: 
 
The green inverter LED is steadily lit.
l
 
The ON/OFF indicator on the LCD panel reads ON.
l
 
P_OK: XXX/YYY:   T here is a connection to the power optimizers and at least one power optimizer is 
l
sending monitoring data. Optimizers send telemetries in a frequency of up to 10 minutes. Initially after 
pairing, both XXX and YYY values show 000 and the values increase as paired power optimizers are 
reported.
NOTE
It may take up to 20 minutes for all power optimizers to transmit their telemetries and to be counted
on the LCD screen.
 
S_OK appears, if the inverter is connected to the SolarEdge monitoring portal. 
l
 
Vac [V] specifies the measured grid AC output voltage. 
l
 
Vdc [v] : Specifies the DC input voltage, which should equal the sum of the output voltages of all 
l
modules (and should be within the operating range of the inverter).
 
Pac [W] specifies the total AC output power produced.
l
 2.  Take note of the serial # on the inverter label using the detachable 2D barcode sticker on each device. 
This information is used in the SolarEdge monitoring portal to identify this inverter and is needed to 
open a new site in the monitoring portal.
Your SolarEdge power harvesting system is now operational.

Step 4: Reporting and Monitoring Installation Data

NOTE
This step requires connecting one of the communication options. Refer to Setting Up
Communication to the Monitoring Portal on page 71.

The SolarEdge Monitoring System

The SolarEdge monitoring portal enables accessing SolarEdge site information, including up-to-date 
information viewed in a physical or logical view.The monitoring portal is described in detail in the 
SolarEdge Monitoring Portal User Guide, available on the SolarEdge website at 
http://www.solaredge.us/files/pdfs/solaredge-monitoring-portal-user-guide.pdf. The SolarEdge 
monitoring portal can display logical and physical layouts of the installed system, as follows:
 
Logical Layout: Shows a schematic logical layout of the components in the system, such as: inverters, 
l
strings and modules, as well as their electrical connectivity. This view enables you to see which 
modules are connected in each string, which strings are connected to each inverter, and so on.
 
Physical Layout: Shows a schematic physical layout of the components in the system, such as: 
l
inverters, strings and modules, as well as their electrical connectivity. This view enables a bird's eye 
view of the actual location of a system component.
60
V d c [ V ]
P a c [ W ]
2 3 4 9 . 3
< S _ O K >
O N
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0

Advertisement

Table of Contents
loading

Table of Contents