Download Print this page
SolarEdge SE330K Quick Installation Manual
SolarEdge SE330K Quick Installation Manual

SolarEdge SE330K Quick Installation Manual

Hide thumbs Also See for SE330K:

Advertisement

Quick Links

SE330K Inverter
Quick Installation Guide
PN: SExxx-xxxxxxxxx
For North America
Version 1.0
Full installation
guide

Advertisement

loading

Summary of Contents for SolarEdge SE330K

  • Page 1 SE330K Inverter Quick Installation Guide PN: SExxx-xxxxxxxxx Full installation For North America guide Version 1.0...
  • Page 2 SAVE THESE INSTRUCTIONS – This manual contains important instructions for the SE330K Inverter that should be followed during installation and maintenance. Using this equipment in a manner not specified in this guide by SolarEdge may impair the protection provided by this equipment.
  • Page 3: Fcc Compliance

    FCC Compliance This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 4: Installing The Power Optimizers

    Installing the Power Optimizers 4  5  6    Use SolarEdge Designer Create a new site in Monitoring Download SolarEdge Mapper Platform and import PV layout to map string Power Optimizers to create and design SE system from SolarEdge Designer https://designer.solaredge.com...
  • Page 5 Installing the Power Optimizers      Install the H1300 Power Optimizer Scan QR code using Mapper ¼” / M6 0.4“ / 10 mm Stainless steel 84 lb*in / 9.5 N*m 0.5” / 12.7 mm 0.4“ / 10 mm 0.4“...
  • Page 6 Connecting the Power Optimizers      CAUTION! Do not sharply bend the DC cables. Keep proper bending radius to avoid cable break. Do not use stretched cabling. Using only MC4 connectors compatible with the Power optimizer. MAN-01-00XXX-1.0...
  • Page 7 Connecting PV Strings Combiner Box When connecting three or more H1300 strings to a combiner box, it is recommended to use a 30A fuse for each individual string. However, be sure to check local electrical codes and regulations to To minimize electromagnetic interference (EMI), make sure to determine the proper fuse minimize the distance between the positive and negative DC cables sizing for your specific...
  • Page 8 Maintaining Clearance Min Indoor Clearance 7.87” / 20 cm where annual average high temperature equals or below 77˚F / 25˚C 19.7" / 19.7" / Min Outdoor Clearance 500 mm 39.4“ / 1000 mm 500 mm It is recommended not to install the inverter directly under the sun CAUTION! Do not block Airflow 42.9”...
  • Page 9 Mounting 40.39“ / 1026 mm 342 lb 155 KG 36.46" / 926 mm Ø 1/2“ / 13 mm MAN-01-00XXX-1.0...
  • Page 10 Removing Covers, Drilling Holes, and Grounding Conduits WARNING DISCONNECT POWER BEFORE REMOVING COVERS P 1 0 CAUTION! Remove panels from inverter before drilling holes Use center drill guides on panels 1.9 lb*ft MAN-01-00XXX-1.0...
  • Page 11 Connecting the PV Arrays and Protective Earth (PE) Max width 1.77” / 45 mm Ø ½” / 12 mm Max thickness 0.51” / 13 mm 315 lib*in 35 N*m Heat shrink insulation PV Array 1 PV Array 2 Max: 600 kcmil / 300 mm To PV Array 1 and 2 Protective Earth PE Lug dimensions: M10...
  • Page 12 Connecting AC and Protective Earth (PE) Max width 1.77” / 45 mm Ø ½” / 12 mm Max thickness 0.51” / 13 mm 315 lib*in 35 N*m Heat shrink insulation Brown Orange Yellow Max: 600 kcmil / 300 mm L1 L2 L3 L1 L2 L3 Ø...
  • Page 13 Accessing the Communication Compartment 34.5 lb*in / 3.9 N*m MAN-01-00XXX-1.0...
  • Page 14: Connecting Communication

    Connecting Communication CAN Bus (for connection between inverters) Up to 13 Inverters per CAN Bus Rotate the When connecting inverters to a CAN communication First Inverter Last Inverter connector and bus, move the relevant switch of the first and last plug-in Switch ON Switch OFF...
  • Page 15 Unlocking Relays and Installing the Covers Move switch to Operation mode Shipment / Operation 31 lb*in / 3.5 N*m MAN-01-00XXX-1.0...
  • Page 16 Commissioning (Part 1) Commissioning when connected to AC from Grid Download Start & follow SetApp Switch ON AC Switch ON DC SolarEdge SetApp Start Download Commissioning when connected only to DC from PV Array Switch ON DC Start & follow SetApp Start MAN-01-00XXX-1.0...
  • Page 17 Commissioning (Part 2) Protocol SolarEdge SolarEdge Leader    Commissioning Protocol SolarEdge Follower Detect    Country & Grid Pairing Site Communication Status MAN-01-00XXX-1.0...
  • Page 18: Led Indications

    LED Indications For detailed Status and System Performance LED Indications: https://www.solaredge.com/leds POWER COMM FAULT Green Blue System is producing Power AC is connected but the system is not producing power Inverter is communicating with the Monitoring platform System error MAN-01-00XXX-1.0...
  • Page 19 Support Contact Information If you have technical problems concerning SolarEdge products, please contact us: https://www.solaredge.com/service/support Subject to change without notice. Copyright © SolarEdge Inc. All rights reserved. September 2023.