Designer
Designer recommends inverter and Power Optimiser selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the PV array layout to the monitoring platform.
Monitoring Platform
The monitoring platform enables monitoring the technical and financial performance of
one or more SolarEdge sites. It provides past and present information on the system
performance both at the system and module levels.
SetApp
SetApp is a mobile application that enables activating and configuring the inverter
through a smartphone or any mobile device.
Installation Procedures
The following procedures are used for installing and setting up a new SolarEdge site.
Some procedures, may also apply to modify an existing site.
1.
Connecting Power Optimizers in
2.
Recording power optimiser serial numbers
3.
Mounting the
inverter, page 25
Activating, commissioning and configuring the
4.
5.
Connecting the inverter to the monitoring
Installation Equipment List
Standard tools can be used during the installation of the SolarEdge system. The
following is a recommendation of the equipment needed for installation:
4 mm Allen torque screwdriver for the inverter enclosure screws
Standard torque flat-head screwdrivers set
Non-contact voltage detector
Mounting hardware (stainless bolts, nuts, and washers) for attaching:
the mounting brackets to the mounting surface
the power optimiser to the racking (not required for smart modules)
Tools:
Three Phase Inverter with SetApp Configuration
Chapter 1: Introducing the SolarEdge Power Harvesting System
Strings, page 1
(optional), page 52
system, page 48
platform, page 53
10