N.B.: the use in electromagnetically non-critical places and in structures made of non-metallic or shielding materials is recommended.
During installation, take the necessary precautions as indicated in fig. 7.
3) Do not operate with the boiler powered on to perform electrical connec-tions of the concentrator. The connection must be made as
indicated on the wiring diagram shown on this instruction leaflet. Connection to the boiler can be made with the supplied 80 cm 4-
pole cable.
4) Fix the lid of the concentrator to the support by engaging it by pressure (fig. 8).
N.B.:: when closing the cover, make sure it is correctly aligned with the fixing support.
N.B.: In order to secure it correctly, the electrical connection terminal board must be positioned in the lower part of the support.
6
Fig. 7
Fig. 8