SolarEdge SE K Series Installation Manual page 82

Three phase inverters with synergy technology
Hide thumbs Also See for SE K Series:
Table of Contents

Advertisement

Chapter 6: Activating, Commissioning and Configuring the
System   81
Figure 38: Pre-commissioning the inverter
 5. Start SetApp on your mobile device and follow the on-screen instructions.
 6. When instructed, hold the ON/OFF/P Switch in P position and release within two
seconds and continue to follow the on-screen instructions.
 7. Disconnect the power bank and cover the power bank input port.
 8. Turn-off the DC Disconnect Switch and the ON/OFF/P Switch.
 9. Wait until the inverter turns-off (all LEDs turn-off).
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se43.2kSe50kSe66.6kSe80kSe100kSe110k ... Show all

Table of Contents