  Pre-commissioning (Off-Grid)

Pre-commissioning (Off-Grid)

The following items are required for Pre-commissioning:
Mobile device with SolarEdge SetApp application
Power bank: 60W output port, USB-C Power Delivery (PD): 20V 3A (not provided)
USB cable: 3.3 ft (1 meter), USB-C to USB-C (not provided)
IMPORTANT NOTE
Commissioning should be performed in full daylight.
NOTE
When pre-commissioning multiple inverters, each inverter need to be
commission individually.
To pre-commission the inverter:
 1. Turn OFF and secure the AC circuit breaker in OFF position in the circuit breakers
panel.
 2. Verify that SolarEdge SetApp is installed on your mobile device.
 3. Turn the DC Disconnect Switch on the Synergy Manager to ON position (if
applicable).
 4. Remove the cover from the Power Bank input port at the bottom of the Synergy
Manager. Connect the USB cable between the Power Bank and the input port -
Upon connection, all LEDs light steady for one minute, and then alternate blue /
green.
NOTE
Alternating red / blue LEDs indicate a problem with the power bank.
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se43.2kSe50kSe66.6kSe80kSe100kSe110k ... Show all

Table of Contents