Table63 describes the openings of the communication glands of the Synergy Manager.
 
 
Gland# Opening
1
Synergy
Manager
2
 
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx
Chapter 5: Setting Up Communication with the Monitoring
Figure 29: Synergy Manager - Communication Glands
Table 1: Synergy Manager - Communication Glans
Three large openings
2.5-5 mm
Two large openings
4.5-7 mm
One small opening 2-
4 mm
Functionality
Ethernet cable (CAT6), Power reduction
cable
External antenna cable, RS485-1 and RS485
-2 cables (CAT6)
External antenna cable