Chapter 4: Connecting PV Modules and AC to the Synergy
Manager   51
Figure 22: Connecting methods of PV Strings and PV arrays to Synergy Manager
NOTE
SolarEdge fixed input Voltage architecture enables parallel PV strings to be of
different lengths. Therefore, they do not need to have the same number of
Power Optimizers as long as the length of each PV string is within the
permitted range.