30
Step 1: Mounting and Grounding the Power Optimizers
5. Verify that each Power Optimizer is securely attached to the module support
structure.
6. Record Power Optimizer serial numbers and locations, as described in Reporting
and Monitoring Installation Data on page 82.
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx