Download Print this page

HP ProBook 650 G1 Product End-Of-Life Disassembly Instructions page 49

Hide thumbs Also See for ProBook 650 G1:

Advertisement

Document No. Cyclone 15B FA DIS ASS'Y SOP
Name
:
Package
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Tabulator:
Alicia Chien
Standard Operation Procedure
Fig.1
Fig.2
Qty
Auditor : Stanley Chen
Ver. :
Step:
1. Inspect M/B. (Fig.1 / Fig.2)
2. Pack the M/B by anti-static bag.
Holding fixture list (holding fixture standard)
Issue department:
29(1/1)
Station :
2013/08/23
0.1
Date
:
NPSU-PPE
Qty

Advertisement

loading