Verifying The Connection - SolarEdge Energy Bank Installation Manual

Home hub inverter single phase for australia
Hide thumbs Also See for Energy Bank:
Table of Contents

Advertisement

 10. The inverter is configured by default to LAN.
 a. Make sure the ON/OFF/P switch is OFF.
 b. Turn ON the AC to the inverter by turning ON the circuit breaker on the main
distribution panel.
 c. Configure the connection as described in Communication on page 46.
NOTE
If your network has a firewall, you may need to configure it to enable
the connection to the following address:
 11. Verify the connection, as described in Verifying the Connection on page 59.

Verifying the Connection

After connecting and configuring a communication option, perform the following steps
to check that the connection to the Monitoring platform has been successfully
established.
 1. Commission the inverter as describe in "Activating, Commissioning and
Configuring the System" on page 43.
 2. Access SetApp and select Status from the Configuring screen.
 3. In the Summary section, under Server Comm., make sure S_OK  is displayed
together with the selected communication option.
 4. Scroll down to the Communication section and check that the communication
options are as required.
SolarEdge Home Hub Inverter Single Phase MAN-01-00812-1.5
Chapter 7: Setting Up Communication with the Monitoring
Destination Address: prodssl.solaredge.com
TCP Port: 443 (for incoming and outgoing data)
Platform   59

Advertisement

Table of Contents
loading

Table of Contents