Step 1: Mounting The Power Optimisers - SolarEdge Energy Bank Installation Manual

Home hub inverter single phase for australia
Hide thumbs Also See for Energy Bank:
Table of Contents

Advertisement

Step 1: Mounting the Power Optimisers

For each of the Power Optimisers
 1. Determine the Power Optimiser mounting location and use the Power
Optimiser mounting brackets to attach the Power Optimiser to the
support structure . It is recommended to mount the Power Optimiser
in a location protected from direct sunlight. For frame-mounted
Power Optimisers follow the instructions supplied with the optimisers,
or refer to
https://www.solaredge.com/sites/default/files/installing_frame_mounted_
power_optimizers.pdf.
 2. If required, mark the mounting hole locations and drill holes.
CAUTION!
Drilling vibrations may damage the Power Optimiser and will void the
warranty. Use a torque wrench or an electric drill with adjustable clutch that
meets the mounting torque requirements. Do not use impact drivers for
mounting the Power Optimiser.
Do not drill through the Power Optimiser or through the mounting holes.
 3. Attach each Power Optimiser to the rack using M6 or M8 stainless steel bolts, nuts
and washers or other mounting hardware. Apply torque of 9-10 N*m. Opti Clamps
may be used instead of M6 bolts to attach Power Optimisers to the rack. For more
information see www.opticlamp.com.au.
 4. Verify that each Power Optimiser is securely attached to the module support
structure.
 5. Record Power Optimiser serial numbers and locations, as described in Reporting
and Monitoring Installation Data on page 50.
(1)
Not applicable to smart modules.
SolarEdge Home Hub Inverter Single Phase MAN-01-00812-1.5
Chapter 2: Installing the Power
(1)
:
Optimisers   17

Advertisement

Table of Contents
loading

Table of Contents