SolarEdge SE K-AU I Series Quick Installation Manual page 5

Three phase inverter with setapp configuration
Table of Contents

Advertisement

Step 1
Input from module
3
4
Output to string
Use a dual input optimizer (P800p) for parallel connection of two PVs . Use a branch cable
to connect two PVs to a single input optimizer.
4
MAN-01-00695-1.1
2:1 series connection
1
2
3
4
5
Extension cables (4mm
)
2
/1.6"
2
between optimizers are
allowed between rows and
around obstacles

Advertisement

Table of Contents
loading

Table of Contents