Download Print this page

Immergas 3.021452 Manual page 4

Solar inlet probe kit

Advertisement

Available languages

Available languages

MODELS:
GAUDIUM SOLAR
(Fig. 2)
ASSEMBLY.
- Remove voltage to the boiler.
- Disassemble the bottom protective grid.
- Install the DHW inlet probe (1) on the domestic cold water inlet
pipe (3).
- Connect the wiring fastons (2) to the probe (1).
- Open the boiler control panel (if included).
- Got to the electrical connection compartment.
Fig. 2
- Connect the wires to the P.C.B. and to the terminal block as
indicated in the boiler instruction book, making sure to feed
the wires through the specific space designed.
- Clamp the new wires to the cables in the boiler with the supplied
clips.
- Close the connection compartment, close the control panel
(included), refit the bottom protective grid and restore power
to the boiler to bring it back to normal operating conditions
3
1
2

Advertisement

loading