Download Print this page

Immergas 3.021452 Manual page 3

Solar inlet probe kit

Advertisement

Available languages

Available languages

GENERAL WARNINGS.
All Immergas products are protected with suitable transport pack-
aging.
The material must be stored in a dry place protected from the
weather.
This instruction manual provides technical information for installing
the Immergas kit. As for the other issues related to kit installation
(e.g. safety at the workplace, environmental protection, accident
prevention), it is necessary to comply with the provisions specified
in the regulations in force and with the principles of good practice.
Improper installation or assembly of the Immergas appliance and/
or components, accessories, kits and devices can cause unexpected
problems for people, animals and objects. Read the instructions
provided with the product carefully to ensure proper installation.
Installation and maintenance must be performed in compliance
with the regulations in force, according to the manufacturer's in-
structions and by professionally qualified staff, meaning staff with
specific technical skills in the plant sector, as envisioned by the law.
DESCRIPTION.
This kit allows connecting a probe on the domestic cold water
inlet pipe of the boiler to prevent unnecessary ignitions in systems
with water heating through solar systems or alternative sources.
The boiler will not turn on if the inlet water is sufficiently hot.
The reading of the DHW inlet probe is signalled on the display
by the symbol (
) lighting up. For further information and on
how to set the boiler, see the relative instruction book.
Fig. 1
Cod. 1.037161 - Rev. ST.000843/005
IE
SOLAR INLET PROBE KIT
COD. 3.021452
MODELS:
VICTRIX TT SERIES
VICTRIX TERA - TERA V2
VICTRIX TERA VIP
MAIOR KW
VICTRIX EXA
VICTRIX HYBRID
KIT COMPOSITION.
Ref
1 DHW inlet NTC probe
2 Connection wiring
-
ASSEMBLY.
- Remove voltage to the boiler.
- Disassemble the bottom protective grid.
- Install the DHW inlet probe (1) on the domestic cold water inlet
pipe (3).
- Make sure the pipe on which the probe is installed is made of
copper
- Connect the wiring fastons (2) to the probe (1).
- Got to the electrical connection compartment.
- Connect the wires to the terminal block as indicated in the
boiler instruction book, making sure to feed the wires through
the specific space designed.
- Clamp the new wires to the cables in the boiler with the supplied
clips.
- Close the connection compartment, refit the bottom protective
grid and restore power to the boiler to bring it back to normal
operating conditions.
2
(Fig. 1)
(Fig. 1)
(Fig. 1)
(Fig. 1)
(Fig. 1)
Kit components description
Wiring clips
3
1
(Fig. 1)
Qty
1
1
2

Advertisement

loading