INSTRUCTIONS FOR MODELS:
VICTRIX ZEUS SUPERIOR 2021
VICTRIX SUPERIOR 2022
VICTRIX SUPERIOR 35 PLUS
Installation and maintenance must be performed in compliance
with the regulations in force, according to the manufacturer's
instructions and by authorised professionally qualified person-
nel, intending personnel with specific technical skills in the plant
sector, as envisioned by the Law.
KIT INSTALLATION.
- Remove voltage from the appliance by disconnecting the switch
upstream from the boiler.
- Disassemble the boiler casing (see instruction booklet relative
to the boiler model).
- Open the control panel compartment to install the relay board
(1).
- Mount the board making the male pin (2) match the hole in the
board (1) and fix it using the cross-head screw (3) (see figure
7-1).
2
1
6
5
- Make the electric connections between the relay board (1) and
boiler electrical connection compartment (for 230V power
supply) and between relay board and boiler P.C.B. located in
the rear part of the boiler panel (for control signals) using the
relative wiring composed of two cables supplied with the kit.
- The connection cable (6) between the relay board (1) and the
boiler board (4) must comply with the path (see fig. 7-1).
- The power supply (5) must be connected to terminals A and
B (see fig. 7-1).
- Connect the external components according to the require-
ments following the wiring diagrams given on the next pages.
- Close the control panel, re-mount the casing and re-apply the
voltage to the appliance to take it back to normal functioning
conditions.