Control Cable Installation - BRP EVINRUDE E-TEC 115 HP 2011 Service Manual

Table of Contents

Advertisement

Refer to the following diagram to ensure proper
positioning of rigging components in grommet.
10
9
8
5
1. Fuel supply hose
2. Fuel supply hose--alternate location
3. Oil supply hose
4. Oil tank sending unit harness
5. Battery cables
6. Main wire harness (MWS)
7. Shift cable
8. Throttle cable
9. Accessory charge wires
10. CANbus harness
11. Water pressure hose
12. Speedometer hose
1. Alternate fuel hose location
The main wiring harness, battery cables, oil tank
sending unit harness, and any ICON or I-Com-
mand network cables should be routed along the
11
6
12
4
7
3
1
2
000095c
1
004946
OUTBOARD RIGGING CONNECTIONS
same path to the starboard side of the powerhead.
Secure all cables with clamps.
1. Anchor points
NOTICE
After installation, make sure there
is enough clearance for all cables to avoid
binding or chafing through all engine steering
and tilting angles.

Control Cable Installation

Refer to Control Cable Identification on p. 15.
Remove control cable trunnion covers and cable
attachment hardware.
1
1. Trunnion covers
ROUTINE SERVICE
1
004949
004955
17
2

Advertisement

Table of Contents
loading

Table of Contents