Verifying the Connection

After connecting and configuring a communication option, perform the following
steps to check that the connection to the monitoring server has been successfully
established.
 1. Close the inverter cover: Attach the inverter cover and secure it by tightening the
screws with a torque of 10.3 N*m/ 7.6 lb.*ft. For proper sealing, first tighten the
corner screws and then the two central screws (see also Figure 17 ).
 2. If not already ON - Turn ON the AC to the inverter by turning ON the circuit breaker
on the main distribution panel and turning on the DC Safety Unit (if applicable).
 3. Wait for the inverter to connect to the SolarEdge monitoring platform. This may take
up to two minutes.
A status screen similar to the following appears on the LCD panel:
 
V a c [ V ] V d c [ V ] P a c [ w ]
2 4 0 . 7     1 4 . 1           0 . 0
P _ O K : 0 0 0 / 0 0 0 < S _ O K >
                                                                                                  - - - - - - - - - - - - - - -
S_OK: Indicates that the connection to the SolarEdge monitoring platform is
successful. If S_OK is not displayed, refer to Errors and Troubleshooting on page 78.
Three Phase System MAN-01-00507-4.2
Chapter 7: Setting Up Communication to the Monitoring Platform