Opening Conduit Drill Guides - SolarEdge UL1741-SA Installation Manual

Single phase inverter with hdwave technology with setapp configuration
Table of Contents

Advertisement

30

Opening Conduit Drill Guides

ON/ OFF/
Indication
Inverter
configuration
or reboot
Inverter
firmware
upgrade
Error
The following table describes production percentage of AC information by LED color
and ON/OFF/P switch position.
Indication
Percentage of AC
Production:
0 %
Percentage of AC
Production:
0 - 33 %
Percentage of AC
Production:
33 - 66 %
Percentage of AC
Production:
66 - 100 %
Opening Conduit Drill Guides
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
1. Move the Safety Switch ON/OFF/P switch and the inverter ON/OFF/P switch to OFF.
2. Loosen the screws on the front cover of the Safety Switch, as shown below:
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.4
P
Switch
Red
Position
ON / P
ON
ON / P
Alternating Alternating
Any
ON
ON/
OFF/ P
Switch
Position
ON (1)
LED Color
Green
ON
Alternating
ON/ OFF/
ON/ OFF /
Blinking/
Blinking
Flickering
LED Color
Red
Green
OFF
OFF
OFF
ON
OFF
OFF
OFF
ON
Comment
Blue
ON
The upgrade
process can take
up to 5 minutes
Refer to Errors
and
Troubleshooting
on page 62
Comment
Blue
OFF
This indicates
OFF
power
production as
percentage of
rated peak AC
ON
output power
ON

Advertisement

Table of Contents
loading