 3.  Insert the card into the communication board slot marked "CARD".
 4.  Turn ON the battery   A UX switch and circuit breaker. Wait 1 minute before proceeding.
 5.  Turn ON AC to the inverter.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is
removed.
RISQUE D'ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le couvercle de l'onduleur
est retiré.
 6.  The upgrade starts automatically. Wait for the message Done to be displayed on the LCD.
 7.  Remove the card from the inverter.
Configuring the RS485 Bus for Battery and Meter
Connection
This section describes how to set up the RS485 communication between the       i nverter, 
meter and one battery. 
For information on configuring two batteries, refer to   t he StorEdge Applications 
Connection and Configuration Guide available at  
http://www.solaredge.com/sites/default/files/storedge_applications_connection_and_
configuration_guide_na.pdf.
Some inverters are equipped with a built-in Revenue Grade Meter (RGM), which is located in the 
Connection Unit. When an additional meter is installed for these inverters, the second meter is 
connected to the existing RGM in a daisy chain.
To configure the RS485 bus:
 1.  Turn OFF or verify that the Connection Unit switch   i s OFF.
 2.  Turn the inverter ON/OFF switch to OFF.