Installing The 9V Battery And Fuses - SolarEdge StorEdge SE7600A-US1 Installation Manual

With backup
Table of Contents

Advertisement

Installing the 9V Battery and Fuses
Installing the 9V Battery and Fuses
A 9V battery is supplied with the inverter accessories. Install the 9V battery in the holder on the top board 
of the Connection Unit and connect it to the battery pad.
Figure 18: The battery holder
Two 25A fuses are supplied with the high power inverters. Install the fuses in the holders on the top board 
of the Connection Unit .
Figure 19: Connection Unit fuses
32
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3

Advertisement

Table of Contents
loading

Table of Contents