Solaredge Monitoring Platform; Installation Procedure; Installation Equipment List - SolarEdge SE8K-N4 Installation Manual

Three phase inverter with synergy technology
Table of Contents

Advertisement

SolarEdge Monitoring Platform

The SolarEdge monitoring platform enables monitoring the technical and financial performance of one or 
more SolarEdge sites. It provides past and present information on the system performance both at the 
system and module levels.

Installation Procedure

The following is the procedure for installing and setting up a new SolarEdge site. Many of these also apply 
to modification of an existing site.
 1.  Installing the Power Optimizers,  page 13
 2.  Mounting and Connecting the Primary and Secondary Unit(s), page 23
NOTE
It is recommended to connect communication connections (step 6 of this installation) before
connecting the AC, for easier access to the communication board.
 3.  Connecting the AC and the Strings to the Connection Unit,page 29
 4.  Activating and Commissioning the System Using SetApp, page 35
 5. 
Configuring the   S
ystem Using SetApp ,page 40
 6.  Setting Up Communication page 54                                                            
 

Installation Equipment List

Standard tools can be used during the installation of the SolarEdge system. The following is a 
recommendation of the equipment needed for installation:
 
Allen screwdriver for 5mm screw type for the inverter cover,Connection Unit   c over, and inverter side 
l
screws 
 
Allen screwdriver for M5/M6/M8 screw types
l
 
 17/32   H EX Allen screwdriver for AC stud connector
l
 
SolarEdge supplied level
l
 
Standard flat-head screwdrivers set
l
 
Non-contact voltage detector 
l
 
Cordless drill or screwdriver and bits suitable for the surface on which the inverter will be installed. 
l
Use of an impact driver is not recommended.
 
Appropriate mounting hardware   ( for example: stainless bolts, nuts, and washers) for attaching:
l
 
the Primary and Secondary Unit(s) mounting brackets to the mounting surface 
o
 
the power optimizers to the racking (not required for smart modules)
o
 
MC4 crimper
l
 
4xM8 ring terminals and a suitable crimper
l
 
Wire cutters
l
 
Wire strippers
l
 
Voltmeter
l
For installing the communication options, you may also need the following:
 
For Ethernet:
l
 
CAT5/6 twisted pair Ethernet cable with RJ45 connector
o
 
If using a CAT5/6 cable spool: RJ45 plug and RJ45 crimper
o
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
Chapter 1: Introducing the SolarEdge Power Harvesting System
11