Louisiana Grills LG900 Owner's Manual page 10

Table of Contents

Advertisement

Installing the Hopper and Grill Probe
Parts Included:
Series 5C Hopper Assembly
Mounting hardware
2 x #10 x 16 x1/2" screws,
4 x 1/4 x 20 x 1/2" screws
Tools Required:
Phillips Screw Driver Bit
Phillips & Standard
Cordless Drill
Screwdrivers
Installation:
Step 1 Attaching the Igniter to the Hopper:
Carefully remove the igniter and its packaging from inside
the hopper. Diagram A
Using your Phillips Srewdriver and the 2 (two)
#180 x 3/8" screws, secure the Igniter to the
outside of the hopper.
Step 2
Attaching the Grill Probe Wires:
Your Grill/Smoker comes complete with the "Digital Control Center"
complete with grill probe and meat probe. The grill probe has been
factory installed in the barrel, with the excess wire and connections run
out through the barrel end and threaded into the auger feed hole, for
shipping reasons.
Diagram C
The wire connections to the board can be found in or taped to the outside
of the hopper.
Diagram D
To connect, carefully lift the entire hopper and attached igniter, to the
left handside of the main barrel.
Begin by slightly inserting the igniter into the
installed Burned Pot at the bottom side of the
barrel. Support the hopper on your leg as
you connect the two spade connections.
Diagram E
Carefully thread ALL excess wire, as well as
the connections, back into the hopper. The
wiring must not come in contact with either
the fan blades, or the metal auger tube.
Diagram F
Assembly Instruction
Diagram B
E
A
B
C
D
F
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents