Download Print this page
Elkay LZWSM8K Installation, Care & Use Manual

Elkay LZWSM8K Installation, Care & Use Manual

In wall bottle filling station
Hide thumbs Also See for LZWSM8K:

Advertisement

Quick Links

EZWSMD*1A
Installation/Care/Use Manual
LZWSM8*
EZWSM8*
Installer
To assure you install this model easily and correctly, PLEASE READ THESE
SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION. CHECK
YOUR INSTALLATION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND
OTHER APPLICABLE CODES. After installation, leave these instructions inside the
fountain for future reference.
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO
WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY
OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO
A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE
IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING THE PROPER
MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER SHOULD BE
MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING
SYSTEM. WE SUGGEST THAT THE BOTTLE FILLER BE PROTECTED BY A GROUND FAULT CIRCUIT
INTERRUPTER (GFCI)
1/4" O.D. TUBE
WATER INLET
3/8" O.D. TUBE CONNECT
TO COOLER
COLD WATER SUPPLY
NOTE: WATERFLOW
DIRECTION
Fig. 1
EZWSM8*1A
EZWSM8*2A
EZH20 In Wall Bottle Filling Station
LZWSMD*
EZWSMD*
IMPORTANT
BUILDING WATER
INLET
SERVICE STOP
(NOT FURNISHED)
Page 1
LZWSMD*1A
LZWSM8*1A
LZWSM8P*
LZWSMDP*
EZWSM8P*
EZWSMDP*
OPERATION OF QUICK CONNECT FITTINGS
OPERATION OF QUICK CONNECT FITTINGS
SIMPLY PUSH IN
SIMPLY PUSH IN
TUBE IS SECURED
TUBE IS SECURED
TUBE TO ATTACH
IN POSITION
TUBE TO ATTACH
IN POSITION
A
A
B
B
Fig. 2
LZWSM8*2A
PUSH IN COLLET
PUSH IN COLLET
TO RELEASE TUBE
TO RELEASE TUBE
C
C
PUSHING TUBE IN BEFORE
PUSHING TUBE IN BEFORE
PULLING IT OUT HELPS TO
PULLING IT OUT HELPS TO
RELEASE TUBE
RELEASE TUBE
98557C
(Rev. N - 09/16)

Advertisement

loading

Summary of Contents for Elkay LZWSM8K

  • Page 1 EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A Installation/Care/Use Manual EZH20 In Wall Bottle Filling Station LZWSM8* LZWSMD* LZWSM8P* LZWSMDP* EZWSM8* EZWSMD* EZWSM8P* EZWSMDP* Installer To assure you install this model easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES.
  • Page 2 EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A LZWSM8*, LZWSMD* EZWSM8*, EZWSMD* ROUGH-IN Fig. 3 98557C (Rev. N - 09/16) Page 2...
  • Page 3 EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A LZWSM8P*, LZWSMDP* EZWSM8P*, EZWSMDP* ROUGH-IN Fig. 4 98557C (Rev. N - 09/16) Page 3...
  • Page 4: Installation Instructions

    EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A INSTALLATION INSTRUCTIONS Install mounting frame and chiller shelf. See mounting frame instructions. Mount the upper BF panel to the mounting frame: Mount upper panel by aligning holes in the hinge brackets with holes in the mounting frame (three places). Mount with ad equate size screws (not provided).
  • Page 5: Mounting Frame

    EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A 10. Connect electrical to chiller: Make sure power supply is identical in voltage, cycle and phase to that specified on cooler serial plate. Never wire Compressor directly to the power supply. While chiller panel is off, adjust cold control if needed. Replace chiller panel: Using the (10) screws re-secure the panel.
  • Page 6 EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A BF6-BF7-BF8 PROGRAMS SETTING THE CONTROL BOARD VERIFY CONTROL BOARD SOFTWARE RESETTING BOTTLE COUNT 1) To verify the software program of the control board the 1) Depress the program button for approximately 2 seconds unit will need to be shut down and restarted. The chiller until the display changes then release.
  • Page 7 EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A BF9 PROGRAM SETTING THE CONTROL BOARD VERIFY CONTROL BOARD SOFTWARE SETTING UNIT TYPE 1) To verify the software program of the control board the 1) Depress the program button for approximately 2 seconds unit will need to be shut down and restarted. The chiller until the display changes then release.
  • Page 8 EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A BF11 - BF12 PROGRAM SETTING THE CONTROL BOARD VERIFY CONTROL BOARD SOFTWARE Continued from below: 1) To verify the software program of the control board the unit will 2) When the display changes to “SETTINGS”, depress the button again. need to be shut down and restarted.
  • Page 9 PARA PIEZAS, CONTACTE A SU DISTRIBUIDOR LOCAL O LLAME AL 1.800.834.4816 IMPRIMÉ AUX É.-U. POUR OBTENIR DES PIÈCES, CONTACTEZ VOTRE DISTRIBUTEUR LOCAL OU COMPOSEZ LE 1.800.834.4816 ELKAY MANUFACTURING COMPANY • 2222 CAMDEN COURT • OAK BROOK, IL 60523 • 630.574.8484 98557C (Rev. N - 09/16)