Frame Installation; Center Frame Installation Installation - BRP Evinrude E-TEC G2 Service Manual

Hide thumbs Also See for Evinrude E-TEC G2:
Table of Contents

Advertisement

Push the air duct inward to remove it from the
center frame.
1
1. Air duct
Remove the tie strap from each ignition coil
bracket.
1
1. Tie strap
2. Fuel injector mounts
Remove the center frame (wire harness not
shown).

Frame Installation

Center Frame Installation
Locate the center frame on the powerhead
mounts.
Align the air duct extension opening with the cen-
ter frame opening.
009296
1. Center frame mounts (port side shown)
Align the red tape marker on the port side of the
harness to the upper ignition coil bracket as
shown. Secure the harness to each ignition coil
bracket with tie strap, P/N 320107.
2
IMPORTANT:
use a tie strap gun.
009299
1. Red tape
2. Fuel injector mounts
Repeat on starboard side.
009297
Engine Cover and Frame Service
1
Hand tighten the tie strap. Do not
1
Frame Installation
3
009298
2
009299
71

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

E 250 l ho ag b

Table of Contents