Battery Cable Connections; Systemcheck Harness Connections - BRP EVINRUDE E-TEC 200 Service Manual

Table of Contents

Advertisement

Install trunnion cover and screw. Tighten screw to
a torque of 60 to 80 in. lbs. (7 to 9 N·m).
1. Trunnion cover and screw, throttle cable

Battery Cable Connections

Install battery cables on starter solenoid and main
ground stud.
2
1. Positive (+) battery connection
2. Ground (–) connection
OUTBOARD RIGGING CONNECTIONS
SystemCheck Harness
Connections
Remove harness connector cover.
1
005039
Before installing electrical connectors, check th at
the seal is in place. Clean of f any dirt from con-
nectors. Apply a light coat of Electrical Grease to
the seal only. DO NOT fill connectors with Electri-
cal Grease.
1
1. Seal
003975
.ROUTINE SERVICE
003972
1
42079A
21
2

Advertisement

Table of Contents
loading

Table of Contents