Summary of Contents for SolarEdge SEK-AU I Series

  • Page 1 Three Phase Inverter with Synergy Technology Quick Installation Guide PN: SEKxx-AUxxIxxxx Scan for full installation guide For Australia Version 1.1...
  • Page 2 SAVE THESE INSTRUCTIONS – This manual contains important instructions for the Three Phase Inverter with Synergy Technology that should be followed during installation and maintenance. Using this equipment in a manner not specified in this guide by SolarEdge may impair the...
  • Page 3 Notes...
  • Page 4 Installing the Power Optimisers 3  4  5  6   Download SolarEdge Mapper Use SolarEdge Designer to map Array Power Optimisers to design SE System https://designer.solaredge.com Download MAN-01-00822-1.1...
  • Page 5 Installing the Power Optimisers 5  6     Scan QR code using Mapper Install Power Optimiser 10 mm 25 mm (P860,P960, P1600) Stainless steel 9.5 N*m 12.7 mm 10 mm 25 mm (P860,P960, P1600) 10 mm 25 mm (P860,P960, P1600) Complete site registration 10 mm...
  • Page 6 Installing the Power Optimisers      Connect input from Module 2:1 series connection Connect output to Array Use a dual input Power Optimiser (P800p) for parallel connection of two PVs or use a branch cable to connect two PVs to a single input Power Optimiser MAN-01-00822-1.1...
  • Page 7: Connecting The Pv Array

    Connecting the PV Array Check array polarity. V erify 1±0.1V per Power Optimiser Example: 8 Power Optimisers = ~8V MAN-01-00822-1.1...
  • Page 8 Maintaining Clearance Indoor Clearance 15 cm 20 cm where annual average high temperature equals or above 25˚C 40 cm Outdoor Clearance 10 cm 5 cm Horizontal Installation WARNING! Area in front of the inverter must be kept clear for at least one meter CAUTION! Do not block airflow Keep more than 10°...
  • Page 9 Marking & Drilling Holes Level provided template horizontally 15.5 cm 15.5 cm Drill holes 9.3 cm 9.3 cm Mark holes Optional Holes Ø 9 mm Avoid wobbly installation by adding back support Position provided template vertically 18.7 cm Mark holes CAUTION! Do not block airflow 16.6 cm MAN-01-00822-1.1...
  • Page 10: Mounting The Units

    Mounting the Units 4 N*m For left or right units, use only the outer screw 4 N*m 4 N*m 4 N*m 18KG 32KG MAN-01-00822-1.1...
  • Page 11: Connecting Cables

    Connecting Cables Connect cables according to labels Align pin grooves in connector with pin guides in socket CAUTION! Remove plates from unit before drilling holes Max conduit CAUTION! Do not block airflow Max conduit size 1.9 N*m size MAN-01-00822-1.1...
  • Page 12: Removing Covers

    Removing Covers WARNING DISCONNECT POWER BEFORE BEGINNING INSTALLATION MAN-01-00822-1.1...
  • Page 13 Fine stranded more than 3 strings per a single Synergy Unit (whether connected directly or via a combiner box), fuses are required. In SolarEdge system, 25A fuses shall be used Functional electrical earthing of DC-side negative or positive pole is prohibited because the inverter has no transformer.
  • Page 14 Connecting AC and Protective Earth (PE) Max width 33 mm The inverter can either support 4 wires + PE or 3 wires + PE connection Ø 10 mm Switch rated currents: I solar at 40°C and I solar at 60°C shade ambient air temperature is 50A thickness 7 mm CAUTION!
  • Page 15: Lan Communication

    LAN Communication 5.5 N*m COMM 1 Ethernet MAN-01-00822-1.1...
  • Page 16 RS485 Connection of Multiple Inverters Move SW1 switch to ON (up) to terminate first and last inverters on RS485 bus COMM 2 4 N*m    RS485-1 CAT6, 3-wire, shielded, twisted pair (0.2- 1 mm²) max 1km MAN-01-00822-1.1...
  • Page 17 Wi-Fi Communication (Optional) Ordered separately 5.5 N*m MAN-01-00822-1.1...
  • Page 18 Connecting Cellular Communication (Optional) Ordered separately Ordered separately 5.5 N*m MAN-01-00822-1.1...
  • Page 19: Installing Covers

    Installing Covers 3.5 N*m MAN-01-00822-1.1...
  • Page 20 Pre-commissioning when AC Power is Not Connected (Option 1) Download SolarEdge SetApp Connect power bank Start and follow SetApp Turn ON Start Download Power bank: 60W output port , USB-C Power Delivery (PD): 20V 3A (not provided) Cover connector when not used...
  • Page 21 Commissioning with DC and AC Power (Option 2) Download SolarEdge SetApp Turn switches to ON Start & follow SetApp Start Download MAN-01-00822-1.1...
  • Page 22 Commissioning the Leader Inverter Commissioning Country & Language Pairing Solaredge Leader Site Communication RS485-1 Protocol SolarEdge    Follower Detect RS485-1  Inverter Units Status Country MAN-01-00822-1.1...
  • Page 23: Led Indications

    LED Indications POWER COMM FAULT Green Blue System is producing Power AC is connected but the system is not producing power Inverter is communicating with the monitoring platform System error MAN-01-00822-1.1...
  • Page 24 Notes MAN-01-00822-1.1...
  • Page 25 Notes MAN-01-00822-1.1...