ONTROL AND
MAINTENANCE.
- Using an omnipolar disconnector, check connection to
230V-50Hz mains power supply, correct L-N polarity and the
earthing connection;
- make sure the central heating system is filled with water and that
the manometer of the Internal Unit indicates a pressure of 1÷1.2
bar;
- make sure that the air vent valve cap (if present) is open and that
the system is well deaerated;
- check tightness of water circuits;
- check the correlation between the electric and hydraulic con-
nections;
- with request for heat in TA zone 1 and TA zone 2, check that the
mixing valve opens and closes properly; open the latter to check
the intervention of the system safety thermostat (the Internal
Unit flow temperature must be set over 60 °C).
Even if just one single safety check provides a negative result, do
not commission the system.
N.B.: the 16 l DHW (Domestic hot water) expansion vessel is
connected to the hydronic unit via a flexible hose; in the event
of maintenance it is possible to temporarily move the vessel by
unscrewing the lock nut that fastens it to the relative supporting
bracket.
3.1 PROGRAMMING.
See indications in the Internal Unit instruction booklet.
3.2 WIRING DIAGRAM.
See indications in the Internal Unit instruction booklet.