Immergas SUPER TRIO TOP Instructions Booklet And Warnings page 60

Hide thumbs Also See for SUPER TRIO TOP:
Table of Contents

Advertisement

Available languages

Available languages

Installation operations SOLAR HEATING SYSTEM COU-
PLING KIT.
- Close the cold water inlet upstream of the system and empty the
storage tank unit / cylinder.
- Disconnect power supply.
- Assemble the plate heat exchanger (2) to the solar unit (1) by
hanging it in the appropriate seat and securing it with the sup-
plied screw (3), (Fig. 16).
- Couple the solar unit (1) to the hydronic unit (c) by hanging
it to the two appropriate seats, then secure it with the supplied
screws (3), (Fig. 17).
- Make the hydraulic connections of the kit (Fig. 18).
- Remove the two caps present on the storage tank unit / cylinder
to make the connections of the relative pipes (UCS and EFS).
- Connect the interception cock (6) on the plate heat exchanger
by interposing the relative flat gasket / seal.
- Following the sequence below, connect all the pipes taking care
to interpose the flat gaskets present in the kit, pipe RP (long)
- MP (long) - UCS - RP (short) - EFS.
17
60
3
1
3
2
- Connect the two solar system pipes to the specially arranged
fittings, using one of the pre-cut slots (L).
- Fit the fitting of the safety valve. Connect the silicone pipe (5)
to the fitting and insert it in the can (7).
- Insert the solar storage tank unit / cylinder probe (4 Fig. 18) in
the appropriate seat.
- Re-open the cold water inlet and power supply the system again.
16
1
3
3
2
c

Advertisement

Table of Contents
loading

This manual is also suitable for:

Super trio

Table of Contents