Chapter 7: Setting Up Communication With The Monitoring Platform; Communication Options - SolarEdge RESU10H Prime Series Installation Manual

Single phase energy hub inverter with prism technology
Table of Contents

Advertisement

60
  Chapter 7: Setting Up Communication with the Monitoring Platform
Chapter 7: Setting Up Communication with the
Monitoring Platform
The inverter sends the following information to the monitoring platform:
Power Optimizer information received via the DC power lines (the PV output circuit)
Inverter information
Information of any other connected devices
This chapter describes how to set up communication between:
The inverter and the monitoring platform through the Internet (wired/ wireless)
Multiple inverters for a leader-follower configuration
Communication setup is not required for power harvesting, however it is needed for
using the monitoring platform.
CAUTION!
Before connecting the communication cables, make sure that the ON/OFF/P
switch at the bottom of the is turned off, DC Safety Unit is turnd OFF and the
AC is turned OFF.
When configuring the communication parameters, make sure that the
ON/OFF/P switch on the is OFF, and the AC is turned ON.
 
ATTENTION!
Lors de la connexion des câbles de communication, assurez-vous que
l'interrupteur MARCHE/ARRÊT à la base de l'onduleur soit en position ARRÊT,
le sectionneur DC est éteint et le CA est en position ARRÊT. Lors de la
 
configuration des paramètres de communication, assurez-vous que
l'interrupteur MARCHE/ARRÊT soit en position ARRÊT, et le CA est en position
MARCHE.

Communication Options

The following types of communication can be used to transfer the monitored
information from the inverter to the monitoring platform.
Only communication products offered by SolarEdge are supported.
Ethernet
Ethernet is used for a LAN connection.
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00842-1.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Resu16h prime series

Table of Contents