38
Chapter 4: Installing the Battery (Optional)
Chapter 4: Installing the Battery (Optional)
Install the battery in accordance with the manufacturer instructions.
For the SolarEdge Energy Bank installation guide, see:
https://www.solaredge.com/sites/default/files/se-energy-bank-
installation-guide.pdf
In addition, follow these guidelines:
Make sure the battery's circuit breaker switch is OFF.
Measure the necessary length between the and the battery for all cables.
Mark polarity on DC cables.
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00842-1.3