Chapter 4: Connecting AC and PV Strings to
the Inverter
This chapter describes how to connect the inverter to the AC grid, and to the strings of
modules with power optimizers.
If using an inverter with a DC Safety Unit, refer to the instructions in Connecting the
AC Grid to the Inverter or to the DC Safety Switch on page 33.

Grid Connection Guidelines

In most countries, three phase inverters require neutral connection at all times. In
some countries, the three phase inverters can be connected to delta grids; in other
cases, multiple single phase inverters can be used.
Prior to system installation, refer to:
Three Phase Inverters for 3-Wire Grids application note at:
https://www.solaredge.com/sites/default/files/se_three_phase_inverters_for_
delta_grids.pdf
Grids Supported by SolarEdge Inverters application note at:
https://www.solaredge.com/sites/default/files/grids_supported_by_se_
inverters_europe_and_apac.pdf
Countries Supported by the SolarEdge Inverters application note to confirm
compatibility at:
supported_countries.pdf. Installing without confirmation may void the inverter
warranty.
For recommended circuit breaker size per model refer to Determining the Circuit
Breaker Size application note at
https://www.solaredge.com/sites/default/files/determining-the-circuit-breaker-
size-for-three-phase-inverters.pdf
Three Phase Inverter with SetApp Configuration PN: SEXXK-XXXXIXXXX
Chapter 4: Connecting AC and PV Strings to the Inverter
https://www.solaredge.com/sites/default/files/se_inverters_
    32