Enabling Storedge Applications - SolarEdge Energy Bank Installation Manual

Single phase inverter with prism technology
Hide thumbs Also See for Energy Bank:
Table of Contents

Advertisement

Enabling StorEdge Applications

This section describes how to configure your system to use StorEdge applications.
Before enabling StorEdge applications, run a battery self-test, as described above.
Backup Power Applications
The produced power is stored in the battery to be used during power outages. When
the grid voltage is down, the Backup Interface automatically switches to the Backup
mode, disconnecting from the grid, while the Energy Hub inverter supplies power to
the backed-up loads. This application requires connection to the Backup Interface and
backed-up loads (pre-selected or the entire home).
The application can be used in one of two ways:
Backup-only – energy stored in the battery is discharged for backup power only,
that is, when there is no power from the grid
Backup with Smart Energy Management– use some of the battery energy for
backup power, and the rest for maximize self-consumption(MSC) or charge/
discharge profile programming (for time of use arbitrage) applications.
The Backup application can be used whether or not PV modules are installed at the site.
The backup function is disabled by default and can be enabled for on- grid only
application, if backup is not needed.
To start using StorEdge applications, you first need to enable the Backup Configuration
functionality (disabled by default). If Backup Configuration is disabled, the system will
use the battery energy in the following cases:
When PV production is not sufficient in MSC
When using one of charge/discharge profiles that requires battery discharge
However stored energy will not be used to back up the loads in case of power outage.
To enable Backup Configuration:
Open SetApp and select Commissioning > Power Control > Energy Manager >
Backup Configuration > Backup > Enable.
After the Backup Configuration is enabled, the Backup Interface is automatically
configured.
To enable a StorEdge application:
 1. Select Power Control > Energy Manager > Energy Control.
 2. Select one of the following applications:
Single Phase Energy Hub Inverter MAN-01-00812-1.1
Chapter 6: Activating, Commissioning and Configuring the System
    45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se3000hSe4000hSe5000hSe6000hSe8250hSe10000h

Table of Contents