  Chapter 4: Installing the Battery (Optional)

Chapter 4: Installing the Battery (Optional)

Install the battery in accordance with the manufacturer instructions.
In addition, follow these guidelines:
Make sure the battery's circuit breaker switch is OFF.
Measure the necessary length between the and the battery for all cables.
Mark polarity on DC cables.