Removing the Inverter Cover

To remove the inverter cover
 1. Switch off the AC circuit breaker on the main distribution panel.
 2. Switch off the inverter ON/OFF/P switch and wait 5 minutes for the internal
capacitors to discharge.
 3. Turn the DC Disconnect Switch to OFF.
 4. Open the Allen screws of the inverter cover and carefully pull the cover horizontally
before lowering it.
 5. Open the inverter cover.
CAUTION!
When removing the inverter cover, make sure not to damage the internal
components. SolarEdge will not be held responsible for any components
damaged as a result of incautious cover removal.
 

Creating an Ethernet (LAN) Connection

This communication option enables using an Ethernet connection to connect the
inverter to the monitoring platform via LAN.
Ethernet cable specifications:
Cable type – a shielded Ethernet cable (CAT6 may be used).
Maximum distance between the inverter and the router – 100 m/ 330 ft.
NOTE
If using a cable longer than 10 m / 33 ft in areas where there is a risk of
induced voltage surges by lightning, it is recommended to use external surge
protection devices.
For details refer to: .
Three Phase Inverter with SetApp Configuration
Chapter 5: Setting Up Communication with the Monitoring Platform
    40

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se17k-au

Table of Contents