Chapter 4: Connecting Grid and PV Strings to
the Inverter
This chapter describes how to connect the inverter to the AC grid and to the Power
Optimiser of the PV modules on the strings.
Grid Connection Guidelines
Prior to system installation, refer to the following documentation:
Three Phase Inverters for 3-Wire Grids application note at:
https://www.solaredge.com/sites/default/files/se_three_phase_inverters_for_delta_
grids.pdf
Grids Supported by SolarEdge Inverters application note at:
https://www.solaredge.com/sites/default/files/grids_supported_by_se_inverters_
europe_and_apac.pdf
Countries Supported by the SolarEdge Inverters application note (to confirm
compatibility) at:
supported_countries.pdf. Installing without confirmation may void the inverter
warranty.
For recommended circuit breaker size per model refer to Determining the Circuit
Breaker Size application note at
https://www.solaredge.com/sites/default/files/determining-the-circuit-breaker-
size-for-three-phase-inverters.pdf
For short-circuit currents in SolarEdge Three Phase Inverters refer to Short-Circuit
Currents in SolarEdge Three Phase Inverters application note at
https://www.solaredge.com/sites/default/files/se-short-circuit-currents-three-
phase-inverters-tech-note.pdf
NOTE
For more wiring information refer to the SolarEdge
Recommended AC Wiring Application Note , available on the
SolarEdge website at
https://www.solaredge.com/sites/default/files/application-
note-recommended-wiring.pdf
Three Phase Inverter with SetApp Configuration